







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across The Crossings
Kitchen remodeling in The Crossings, FL isn’t just a construction project – it’s a permit job and a community review job before it’s a construction job, which is why out-of-area contractors miss the calendar here. We work The Crossings kitchens constantly, from the 1980s and 1990s CBS homes off Southwest 88th Street through the interior of this ZIP 33186 community, and we understand the review process that shapes the schedule. The Crossings is built out. Almost every kitchen we open involves reworking a room that’s already there, not building new. Call (888) 300-8968 to set up a free estimate and a straightforward conversation about how a remodel here actually runs.
Why The Crossings Homeowners Call Kendall Construction Co for Kitchen Remodeling

Homeowners in The Crossings call us because they’re tired of contractors who quote a start date without understanding that the architectural review board comes first. We handle the sequencing. We know the submittal packet, we know what the board typically approves in this community, and we file it ourselves so it doesn’t stall. Our technicians have up to 14 years of experience, and that experience gets applied to the specific realities of this ZIP 33186 subdivision rather than to a generic menu.
Response time to The Crossings is fast because we’re working Kendall and west Miami-Dade regularly. You’ll get a real conversation, a written line-item estimate, and a realistic calendar. We’re a licensed and insured contractor, we pull permits, and we deliver work that passes inspection the first time – because we know what inspectors here expect. The written estimate sets the final price, and you’ll never see a surprise change order tacked on mid-build.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in The Crossings
Full Kitchen Remodeling
A full kitchen gut in a The Crossings home follows a specific sequence: scope and allowances in writing, permit and board packet submitted together, then cabinet and countertop orders placed against the draw schedule. We don’t order materials before approval is in hand, because material swaps after a permit drawing is finalized trigger re-review. That sequencing is what keeps a full remodel from sitting half-finished. For a deeper look at how we handle the whole scope, see our kitchen remodeling work.
Kitchen Design & Layout
The Crossings kitchens often sit in compact footprints typical of 1990s Mediterranean-style plans, so layout work matters more here than in a newer open-concept home. We plan the flow around real constraints – load-bearing walls, plumbing runs, the way afternoon sun hits a west-facing window – and we present finish selections early because the board needs to see them before the permit drawings get locked in.
Quartz & Granite Countertops
Quartz is the dominant choice in The Crossings because it handles the humidity and heat here without the maintenance granite demands. We install Cambria and other premium surfaces, and we select the slab before the board submittal, not after. Finish samples in hand at the review meeting prevent a costly re-review.
Kitchens Cabinets & Countertops Together
Cabinet installation runs $4,000 – $13,000 for typical The Crossings kitchens, and pairing that with countertops in a single scope keeps the calendar tight. We install KraftMaid and Wellborn cabinetry, plus Blanco sinks when a homeowner wants the fixture match to hold across the whole room.
Backsplash, Tile & Flooring
Backsplash work in The Crossings homes runs $800 – $2,500 typically. Tile and flooring tie the room together, and in this climate the substrate prep matters as much as the finish – moisture behind the wall is common in these older builds, so we open and inspect before we close back up.
Trusted Brands We Service in The Crossings
We work with premium brands across cabinetry and countertops so homeowners in The Crossings can choose materials that fit their standards, not just their budget. For kitchens, that means KraftMaid and Wellborn cabinetry, Cambria and Caesarstone quartz surfaces, Blanco sinks, and Kohler fixtures. You name the finish, we’ll specify it and install it. No switch to a lesser line at the last minute. When a home in The Crossings specifies Cambria in the submittal packet, that’s what gets installed.
Common Kitchen Remodeling Problems We See in The Crossings Homes
- Furring strips over CBS block behind the cabinets: Most The Crossings homes built in the 1980s and 1990s have furring strips over concrete block behind the cabinets, which means rough-in and any load-bearing header work has to be opened and inspected before it’s closed. Cabinet swap-out priced without opening a wall is where budgets slide.
- Original galvanized supply lines: These homes often still carry partial galvanized plumbing behind the kitchen wall. Opening the wall reveals it, and it’s far better to find it in the estimate than mid-build.
- Load-bearing header work that wasn’t planned for: Removing a wall between kitchen and living room can hit a header that needs engineering. Unplanned structural work drives the change order that ruins a timeline.
- Moisture and subfloor damage: Subtropical humidity and rainy-season builds push moisture into the subfloor in these homes, and the problem typically surfaces only after demolition. A realistic allowance for subfloor and moisture repairs prevents the half-finished room that sits open through the wet months.
Pricing for Kitchen Remodeling in The Crossings, FL
Pricing for a kitchen remodel in The Crossings follows the scope, but typical ranges are clear. A full kitchen remodel runs $14,000 – $45,000. A small or partial kitchen remodel runs $9,000 – $20,000. Cabinet installation alone is $4,000 – $13,000, countertop installation is $2,000 – $6,500, backsplash installation is $800 – $2,500, and a kitchen island installation is $3,000 – $10,000. What moves a project toward the top of a range is structural work uncovered behind the wall, a larger footprint, and higher-end finishes in the board packet. Every estimate we write is free, line-item, and fixed price. The written estimate sets the final price, and there are no change orders unless the scope itself changes.
| Service | Typical Estimated Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
See the difference
Before
After
Before
After
Before
AfterThe Crossings Approval Sequence: Why Your Calendar Depends on It
Here is the reality that shapes every kitchen remodel in The Crossings. There are really two approvals in sequence, not one. The Miami-Dade County building permit is one. The community architectural review board is the other. In practice, the board packet – cabinet door style, quartz slab sample, backsplash tile, finish schedule, elevations – usually has to be approved before the permit drawings are finalized. That means the two clocks run in series rather than in parallel. Most out-of-area kitchen contractors miss this when they quote a start date in this ZIP 33186 subdivision, and their schedule slips before they’ve set foot on the job.
The submittal packet itself has real weight in The Crossings. What typically gets approved is a documented finish schedule that matches what will be installed, elevations that show how the cabinetry sits in the room, and elevations that account for the compact footprints common to the 1980s and 1990s Mediterranean-style CBS homes here. We prepare and file the packet. We take the samples to the review, we log them at the specifications a homeowner actually wants, and we hold the order against that approved spec so there’s no re-review that stalls the back half of the calendar. A board submittal logged with cabinet and tile samples that get swapped later forces a re-review, and that’s a calendar problem you can avoid up front.
We schedule the work around approval, not the other way around. Rough-in, cabinet order, countertop order, and the draw schedule all float behind the approval date – not against a guessed start. The result is that a kitchen in The Crossings doesn’t sit half-finished while a punch list waits on a committee date. The scope of work and allowances are in writing before we open a wall, the permit and board packet go in together, and the cabinets and countertops are ordered against the draw schedule so the room closes back up on a realistic timeline.
The other half of the local reality is what’s behind the drywall. A typical The Crossings kitchen job starts there: a 1980s or 1990s CBS home where the original cabinets come out and the walls are furring strips over block with old galvanized supply lines. So the rough-in and any load-bearing header work has to be opened, inspected, and only then closed back up. The usual cause of a project sliding is a contractor who priced cabinet swap-out without opening a wall, then hit moisture damage, undersized wiring for a new range hood, or a header that needed engineering, and the whole calendar moved because the submittal packet had already been logged with the architectural review board at fixed specs. We sequence it the other way from the start.
We Also Serve Cities Near The Crossings
Our kitchen remodeling work reaches beyond The Crossings into the surrounding west Miami-Dade communities. We serve Three Lakes, Country Walk, The Hammocks, and Kendale Lakes, and the same review-board-aware scheduling applies across all of them. If your address is just outside The Crossings, call (888) 300-8968 and we’ll confirm coverage and availability for a free estimate.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in The Crossings
Yes. In The Crossings, a kitchen remodel generally needs both a Miami-Dade County building permit and community architectural review board approval. The board packet usually has to clear before the permit drawings are finalized, so the two approvals run in sequence. Call (888) 300-8968 to talk through your project timeline – estimates are free.
We do. We prepare and file the packet for your The Crossings kitchen, including the finish schedule, elevations, cabinet door style, quartz slab sample and backsplash tile selections. We take the samples to review and hold orders against the approved specs. Call (888) 300-8968 to schedule a free estimate and packet review.
The board review adds a step to the front of the calendar, not the middle. Because the packet typically has to be approved before permit drawings are finalized, cabinets are ordered after review clears rather than before. That ordering keeps materials from being ordered against a spec that then gets swapped. Call (888) 300-8968 for a schedule walk-through – estimates are free.
Usually yes, at least for inspection. In most The Crossings homes from that era, the cabinets come off and the wall behind is furring strips over concrete block, and old galvanized supply lines or an unplanned structural header may be present. Opening and inspecting before closing back up prevents the mid-build change order that drives the budget. Call (888) 300-8968 to plan your estimate.
A line-item scope of work with allowances, a fixed price per the written estimate, the permit requirement, the architectural review timeline for The Crossings, and the order-of-work sequence with draw schedule. All of that belongs in writing before demolition. Call (888) 300-8968 for a free written estimate that spells out every line.
Get a Free Kitchen Remodeling Estimate in The Crossings

The Crossings is a community where the calendar is set by approval sequence, not by the contractor’s eagerness to start. We understand that, we file the packet, and we schedule the work so the kitchen doesn’t sit open while a committee date decides the punch list. You pick the finishes from a range of name brands including KraftMaid, Cambria and Blanco; we handle the sequencing, the permit, the review, and the install. Call (888) 300-8968 to schedule your free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Kendall Construction Co.












